Use advice for data set Type of EPD: Cradle to gate with options, modules A4-5, C1-C4, and D. Module A1: Extraction and processing of reaction resin raw materials. Module A2: Transportation of raw material to the reaction resin plant. Module A3: Reaction resin production at the plant and waste treatment. Module A4: Transportation to the construction site. Module A5: Includes all processes associated with the reaction resin installation, as well as the production, transportation, and treatment of unused reaction resin. Module C1: Demolition/Dismantling of the building. Module C2: Transportation of mixed construction waste for processing. Module C3: Recycling of reaction resin waste as part of its carrier material. No separation of the reaction resin waste from the carrier material is possible. Concrete is used as the carrier material. Module C4: Final disposal of reaction resin waste in sanitary landfill together with carrier material. No separation of the reaction resin waste from the carrier material is possible. Concrete is used as the carrier material. Module D: Credits and burdens for the use of production waste in A3 or packaging waste in A5 as a secondary fuel or thermal/electrical energy generation. There are no credits and burdens from the EoL treatment of the reaction resin waste, as it cannot be separated from its carrier material. Concrete is used as the carrier material. |
Data set use approval |