Close Go back Collapse all sections
Process Data set: Roth QuickBox®-316 (en) en

Key Data Set Information
Location DK
Geographical representativeness description Denmark, Sweden, Norway, Finland & UK
Reference year 2024
Name
Roth QuickBox®-316
Use advice for data set Module A1: Packaging has been included by average use of packaging pr. 1 kg of product. Module A4: The transportation distances provided in this EPD are derived from precise data concerning the distances between production facility and and various sales departments in different countries. Subsequently, it is assumed that the distribution from each of these sales departments to the end customers an approximate distance of 300 km*. *Transportation by truck is assumed on a distributon of 80% EURO 6 and 20% EURO 5, based on data from the companys own logistics provider. Module C2: The estimated transportion distance to the waste handling facility in this EPD is 100 km, assuming the use of a truck as the transport method.
Technical purpose of product or process Roth QuickBox® -316 for wall and panel wall is delivered as a single box and as a double box with push-fit coupling for 18 mm PEX pipes. Roth QuickBox® -316 is made of transparent, molded plastic with a pre-mounted elbow in AISI 316 stainless steel and pressure testing plug. The pre-mounted sealing nipple and lock are approved according to Norwegian NT VVS 129 and meet the requirements of Danish SBI guideline 252 and BR18. The push-fit coupling ensures a quick and secure connection. The transparent plastic allows for checking the insertion depth from the side or front.
Classification
Class name : Hierarchy level
  • EPDNorge: Construction / Piping
General comment on data set Data quality: Specific data for the product composition are provided by the manufacturer. The data represent the production of the declared product and were collected for EPD development in the year of study. Background data is based on EPDs according to EN 15804 and different LCA databases. The data quality of the raw materials in A1 is presented in the table below. Allocation: The allocation is made in accordance with the provisions of EN 15804. Incoming energy and water and waste production in-house is allocated equally among all products through mass allocation. Effects of primary production of recycled materials is allocated to the main product in which the material was used. The recycling process and transportation of the material is allocated to this analysis. Cut-off criteria: All major raw materials and all the essential energy is included. The production processes for raw materials and energy flows with very small amounts (less than 1%) are not included. These cut-off criteria do not apply for hazardous materials and substances.
Copyright Yes
Owner of data set
Quantitative reference
Reference flow(s)
Biogenic carbon content
  • Carbon content (biogenic): 1.0 kg
  • Carbon content (biogenic) - packaging: 1.0 kg
Time representativeness
Data set valid until 2029
Time representativeness description "2024-12-16" - "2029-12-16"
Technological representativeness
Technology description including background system Roth QuickBox® -316 is made of AISI 316 stainless steel. It is used where a larger flow is needed and where a ¾" connection is required. Roth QuickBox® -316 can be used at outlets where larger amounts of water are desired in a shorter time, such as for shower systems, bathtubs, or industrial kitchens. Roth QuickBox® -316 is part of Roth’s leak-proof installation system, a complete system-approved program. Roth QuickBox® -316 box is made of transparent, molded plastic with a pre-installed stainless steel angle and pre-installed pressure testing plug. The transparent plastic makes it easy to check the insertion depth from the side or front. Roth QuickBox® -316 comes complete with seals that ensure any leaking water does not penetrate other building parts. Both the PEX pipe and the conduit are assembled using the insertion principle, meaning the PEX pipe is inserted into the elbow of the Roth QuickBox® -316 and then the conduit is inserted into the conduit seal.

Indicators of life cycle

IndicatorDirectionUnit Production
A1-A3
Transport
A4
Installation
A5
De-construction
C1
Transport
C2
Waste processing
C3
Disposal
C4
Recycling Potential
D
Input
  • 14.31
  • 0.05322
  • 0.0002932
  • 0
  • 0.003756
  • 0.007957
  • 0.0001567
  • -5.319
Input
  • 0.3486
  • 0
  • -0.3486
  • 0
  • 0
  • 0
  • 0
  • 0
Input
  • 14.65
  • 0.05322
  • -0.3483
  • 0
  • 0.003756
  • 0.007957
  • 0.0001567
  • -5.319
Input
  • 146.5
  • 5.179
  • 0.01496
  • 0
  • 0.2662
  • 0.1437
  • 0.008236
  • -0.758
Input
  • 13.29
  • 0
  • -0.6944
  • 0
  • 0
  • -12.6
  • 0
  • 0
Input
  • 159.8
  • 5.179
  • -0.6794
  • 0
  • 0.2662
  • -12.46
  • 0.008236
  • -0.758
Input
  • 0.5262
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
Input
  • 0.2018
  • 0.001757
  • 0.000008791
  • 0
  • 0.0001344
  • 0.0001713
  • 0.000003398
  • -0.001382
Input
  • 0.2837
  • 0.01098
  • 0.00003091
  • 0
  • 0.0004799
  • 0
  • 0.0001023
  • -0.3289
Input
  • 0.07493
  • 0.0004015
  • 0.000007363
  • 0
  • 0.00002803
  • 0.001206
  • 0.000009657
  • -0.00639
Output
  • 0.125
  • 0.0002419
  • 0
  • 0
  • 0.00001357
  • 0
  • 0.0007533
  • 0.00002404
Output
  • 5.025
  • 0.1123
  • 0.05886
  • 0
  • 0.01272
  • 0
  • 0.0561
  • -0.0153
Output
  • 0.0005657
  • 0.00003569
  • 0
  • 0
  • 0.000001815
  • 0
  • 3.432E-9
  • -0.00000455
Output
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
Output
  • 0.7359
  • 0
  • 0.04789
  • 0
  • 0
  • 0.4992
  • 0
  • 0
Output
  • 0.02579
  • 0
  • 0.002973
  • 0
  • 0
  • 0.4453
  • 0
  • 0
Output
  • 0.002024
  • 0
  • 0.002433
  • 0
  • 0
  • 0.6877
  • 0
  • 0
Output
  • 0.03062
  • 0
  • 0.03681
  • 0
  • 0
  • 10.4
  • 0
  • 0

IndicatorUnit Production
A1-A3
Transport
A4
Installation
A5
De-construction
C1
Transport
C2
Waste processing
C3
Disposal
C4
Recycling Potential
D
Abiotic depletion potential - fossil resources (ADPF)
  • 156.5
  • 5.179
  • 0.01496
  • 0
  • 0.2661
  • 0.1437
  • 0.008236
  • -0.758
Abiotic depletion potential - non-fossil resources (ADPE)
  • 0.0001785
  • 0.000005704
  • 2.363E-8
  • 0
  • 4.781E-7
  • 1.139E-7
  • 2.437E-9
  • -3.856E-7
Acidification potential, Accumulated Exceedance (AP)
  • 0.05658
  • 0.007925
  • 0.000004853
  • 0
  • 0.00007215
  • 0.0002295
  • 0.00000255
  • -0.0004351
Global Warming Potential - biogenic (GWP-biogenic)
  • 0.02801
  • 0.0001281
  • 0.07217
  • 0
  • 0.000007197
  • 0.0000227
  • 2.389E-7
  • -0.0001177
Global Warming Potential - fossil fuels (GWP-fossil)
  • 11.6
  • 0.379
  • 0.001983
  • 0
  • 0.01765
  • 1.062
  • 0.0003095
  • -0.0479
Global Warming Potential - total (GWP-total)
  • 11.63
  • 0.3792
  • 0.07415
  • 0
  • 0.01766
  • 1.062
  • 0.0003098
  • -0.05009
Global Warming Potential - land use and land use change (GWP-luluc)
  • 0.005668
  • 0.000223
  • 3.268E-7
  • 0
  • 0.00000617
  • 0.000004221
  • 5.674E-8
  • -0.002072
  • 11.61
  • 0.3792
  • 0.001983
  • 0
  • 0.01766
  • 1.062
  • 0.001554
  • -0.043
Eutrophication potential - freshwater (EP-freshwater)
  • 0.0003951
  • 0.000002186
  • 8.311E-9
  • 0
  • 1.386E-7
  • 2.013E-7
  • 2.766E-9
  • -0.000004595
Eutrophication potential - marine (EP-marine)
  • 0.01055
  • 0.001957
  • 0.000002538
  • 0
  • 0.0000214
  • 0.0001097
  • 9.398E-7
  • -0.0001497
Eutrophication potential - terrestrial (EP-terrestrial)
  • 0.1165
  • 0.02178
  • 0.00001738
  • 0
  • 0.0002366
  • 0.001126
  • 0.00001039
  • -0.001626
Photochemical Ozone Creation Potential (POCP)
  • 0.03616
  • 0.005752
  • 0.000005234
  • 0
  • 0.00007245
  • 0.0002714
  • 0.000002961
  • -0.0004223
Depletion potential of the stratospheric ozone layer (ODP)
  • 9.212E-7
  • 8.224E-8
  • 2.23E-10
  • 0
  • 4.024E-9
  • 2.265E-9
  • 1.23E-10
  • -0.004394
Water (user) deprivation potential (WDP)
  • 377.7
  • 2.841
  • 0.03107
  • 0
  • 0.2539
  • 1.028
  • 0.02321
  • -11.38

IndicatorUnit Production
A1-A3
Transport
A4
Installation
A5
De-construction
C1
Transport
C2
Waste processing
C3
Disposal
C4
Recycling Potential
D
1This impact category deals mainly with the eventual impact of low dose ionizing radiation on human health of the nuclear fuel cycle. It does not consider effects due to possible nuclear accidents, occupational exposure nor due to radioactive waste disposal in underground facilities. Potential ionizing radiation from the soil, from radon and from some construction materials is also not measured by this indicator.
2The results of this environmental impact indicator shall be used with care as the uncertainties on these results are high or as there is limited experiences with the indicator.
Potential Human exposure efficiency relative to U235 (IRP) 1
  • 0.545
  • 0.02242
  • 0.0000653
  • 0
  • 0.001163
  • 0.0003601
  • 0.00003608
  • -0.005555
Potential incidence of disease due to PM emissions (PM) 2
  • 6.671E-7
  • 9.418E-9
  • 7.7E-11
  • 0
  • 1.271E-9
  • 1.004E-9
  • 5.1E-11
  • -2.908E-8
Potential Soil quality index (SQP) 2
  • 43.2
  • 1.982
  • 0.01578
  • 0
  • 0.1835
  • 0.02613
  • 0.0296
  • -5.759
Potential Comparative Toxic Unit for humans - non-cancer effects (HTP-nc) 2
  • 3.544E-7
  • 1.749E-9
  • 2.1E-11
  • 0
  • 2.12E-10
  • 2.736E-9
  • 4E-12
  • -5.798E-9
Potential Comparative Toxic Unit for humans - cancer effects (HTP-c) 2
  • 5.622E-8
  • 0
  • 0
  • 0
  • 0
  • 5.9E-11
  • 0
  • -2.4E-11
Potential Comparative Toxic Unit for ecosystems (ETP-fw) 2
  • 237.7
  • 3.374
  • 0.01793
  • 0
  • 0.196
  • 2.187
  • 0.005014
  • -3.999