Close Go back Collapse all sections
Process Data set: Half-turn staircase without risers, with and without railing on one side (en) en

Key Data Set Information
Location DK
Geographical representativeness description Denmark
Reference year 2025
Name
Half-turn staircase without risers, with and without railing on one side
Use advice for data set This Environmental Product Declaration (EPD) is based on a cradle-to-grave approach and includes the following life cycle modules, in accordance with EN 15804: A1–A3 (Product stage): Covers the extraction and processing of raw materials, transportation of materials to the production site, and the manufacturing of the staircase components. This includes the processing of solid wood, adhesives, metal fasteners, and surface treatments. A4 (Transport): Accounts for the transportation of the finished staircase from the production site to the place of installation. A5 (Construction/installation): Includes the activities related to on-site installation of the staircase, such as handling, assembly, use of fasteners and adhesives, and disposal of packaging materials. C1 (Deconstruction/demolition): Refers to the dismantling of the staircase at the end of its service life. C2 (Transport): Covers the transport of dismantled materials to waste treatment or recycling facilities. C3 (Waste processing): Includes processes such as sorting, shredding, and other pre-treatment before final disposal or recycling. C4 (Disposal): Accounts for the final disposal of materials not suitable for recycling or energy recovery (e.g., landfill or incineration without energy use). D (Benefits and loads beyond the system boundary): Considers potential benefits and avoided impacts from the recycling and energy recovery of materials, such as reuse of wood in secondary applications or energy generation from waste wood, as well as metal recycling.
Technical purpose of product or process Wooden staircase for indoor housing with a width of 90–95 cm. The staircase is made of solid wood. The staircase is constructed from solid wood, primarily pine and oak. Additional wood types may also be included. Adhesives, metal fasteners, and surface treatments are used in the production to ensure stability, durability, and a high-quality finish.
General comment on data set Data quality: Specific data for the product composition are provided by the manufacturer. The data represent the production of the declared product and were collected for EPD development in the year of study. Background data is based on EPDs according to EN 15804 and different LCA databases. The data quality of the raw materials in A1 is presented in the table below. Allocation: The allocation is made in accordance with the provisions of EN 15804. In forestry, economic allocation between sawn timber and solid wood is used. At sawmills, energy, water, waste, materials and internal transport are divided into sub-processes and then allocated according to income between the main and secondary products. Environmental impact and resource consumption for the primary production of recycled materials is allocated to the original product system. Cut-off criteria: All major raw materials and all the essential energy is included. The production processes for raw materials and energy flows with very small amounts (less than 1%) are not included. These cut-off criteria do not apply for hazardous materials and substances.
Copyright Yes
Owner of data set
Quantitative reference
Reference flow(s)
Biogenic carbon content
  • Carbon content (biogenic): 131.579043813397 kg
  • Carbon content (biogenic) - packaging: 0.0 kg
Time representativeness
Data set valid until 2030
Technological representativeness
Technology description including background system Wood materials: Solid pine and oak. Adhesives: High-strength glue suitable for indoor staircase applications. Fasteners: Metal screws provide reinforcement and secure assembly. Surface treatment: Protective coatings applied for durability, aesthetics, and resistance to wear. Production quality: All wood is processed and finished to meet requirements for indoor housing staircases with a width of 90–95 cm

Indicators of life cycle

IndicatorDirectionUnit Production
A1-A3
Transport
A4
Installation
A5
De-construction
C1
Transport
C2
Waste processing
C3
Disposal
C4
Recycling Potential
D
Input
  • 7352
  • 72.85
  • 0
  • 0.02959
  • 0.4368
  • 0.9716
  • 0.07811
  • -2233
Input
  • 5511
  • 0
  • 0
  • 0
  • 0
  • -5511
  • 0
  • 0
Input
  • 1.286E+4
  • 72.85
  • 0
  • 0.02959
  • 0.4368
  • -5.51E+3
  • 0.07811
  • -2233
Input
  • 2.36E+3
  • 2566
  • 0
  • 5.47
  • 30.45
  • 29.45
  • 1.469
  • -1767
Input
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
Input
  • 2.36E+3
  • 2566
  • 0
  • 5.47
  • 30.45
  • 29.45
  • 1.469
  • -1767
Input
  • 0.006478
  • 0
  • 0
  • 0.002686
  • 0
  • 0
  • 0
  • 0
Input
  • 45.09
  • 1.841
  • 0
  • 0.0007278
  • 0.01555
  • 0.02265
  • 0.001947
  • -35.82
Input
  • 0.9916
  • -10.62
  • 0
  • 0.01071
  • 0.05461
  • 0
  • 1.068
  • -0.4502
Input
  • 5.284
  • 0.5974
  • 0
  • 0.0002815
  • 0.003445
  • 0.06126
  • 0.001348
  • -3.567
Output
  • 0.9437
  • 0.6685
  • 0
  • 0.000161
  • 0.001642
  • 0
  • 2.517
  • -0.3249
Output
  • 40.82
  • 73.39
  • 0
  • 0.006476
  • 1.887
  • 0
  • 0.9503
  • -10.53
Output
  • 0.01072
  • 0.01523
  • 0
  • 0.00003798
  • 0.000207
  • 0
  • 0.000007256
  • -0.001576
Output
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
Output
  • 0.1064
  • 0
  • 0
  • 0.002638
  • 0
  • 0
  • 0
  • 0
Output
  • 0.000007234
  • 0
  • 0
  • 0.000008178
  • 0
  • 301.4
  • 0
  • 0
Output
  • 0.00004097
  • 0
  • 0
  • 0.00002804
  • 0
  • 209.6
  • 0
  • 0
Output
  • 0.0006199
  • 0
  • 0
  • 0.0004242
  • 0
  • 3171
  • 0
  • 0

IndicatorUnit Production
A1-A3
Transport
A4
Installation
A5
De-construction
C1
Transport
C2
Waste processing
C3
Disposal
C4
Recycling Potential
D
Abiotic depletion potential - fossil resources (ADPF)
  • 2358
  • 2565
  • 0
  • 5.47
  • 30.44
  • 29.44
  • 1.469
  • -1767
Abiotic depletion potential - non-fossil resources (ADPE)
  • 0.00238
  • 0.01631
  • 0
  • 6.097E-7
  • 0.00005136
  • 0.00001493
  • 9.294E-7
  • -0.0008564
Acidification potential, Accumulated Exceedance (AP)
  • 0.922
  • 0.8646
  • 0
  • 0.004157
  • 0.0113
  • 0.0472
  • 0.0005534
  • -0.9412
Global Warming Potential - biogenic (GWP-biogenic)
  • -480.7
  • 0.1595
  • 0
  • 0.00007451
  • 0.0008512
  • 480.5
  • 0.00008082
  • -0.3084
Global Warming Potential - fossil fuels (GWP-fossil)
  • 164.5
  • 180.3
  • 0
  • 0.3974
  • 1.983
  • 3.691
  • 0.1489
  • -149.4
Global Warming Potential - total (GWP-total)
  • -314.8
  • 180.5
  • 0
  • 0.3975
  • 1.985
  • 484.2
  • 0.149
  • -150.7
Global Warming Potential - land use and land use change (GWP-luluc)
  • 1.368
  • 0.08789
  • 0
  • 0.00003132
  • 0.000702
  • 0.0005633
  • 0.00002405
  • -0.1752
  • 208.7
  • 180.5
  • 0
  • 0.3975
  • 1.985
  • 3.727
  • 0.1542
  • -177.8
Eutrophication potential - freshwater (EP-freshwater)
  • 0.01742
  • 0.003443
  • 0
  • 0.000001447
  • 0.00001632
  • 0.00006169
  • 0.000001983
  • -0.009383
Eutrophication potential - marine (EP-marine)
  • 0.2242
  • 0.2155
  • 0
  • 0.001835
  • 0.004043
  • 0.02263
  • 0.0001754
  • -0.1547
Eutrophication potential - terrestrial (EP-terrestrial)
  • 2.699
  • 2.411
  • 0
  • 0.02013
  • 0.04455
  • 0.2405
  • 0.001989
  • -2.154
Photochemical Ozone Creation Potential (POCP)
  • 0.9427
  • 0.7574
  • 0
  • 0.005536
  • 0.01274
  • 0.05896
  • 0.0005519
  • -0.4726
Depletion potential of the stratospheric ozone layer (ODP)
  • 0.00001475
  • 0.00003364
  • 0
  • 8.59E-8
  • 4.521E-7
  • 3.077E-7
  • 1.766E-8
  • -0.000005459
Water (user) deprivation potential (WDP)
  • 4.24E+4
  • 3231
  • 0
  • 1.162
  • 28.86
  • 71.62
  • 13.64
  • -1.749E+4

IndicatorUnit Production
A1-A3
Transport
A4
Installation
A5
De-construction
C1
Transport
C2
Waste processing
C3
Disposal
C4
Recycling Potential
D
1This impact category deals mainly with the eventual impact of low dose ionizing radiation on human health of the nuclear fuel cycle. It does not consider effects due to possible nuclear accidents, occupational exposure nor due to radioactive waste disposal in underground facilities. Potential ionizing radiation from the soil, from radon and from some construction materials is also not measured by this indicator.
2The results of this environmental impact indicator shall be used with care as the uncertainties on these results are high or as there is limited experiences with the indicator.
Potential Human exposure efficiency relative to U235 (IRP) 1
  • 12.85
  • 10.34
  • 0
  • 0.02344
  • 0.1331
  • 0.05716
  • 0.006833
  • -5.907
Potential incidence of disease due to PM emissions (PM) 2
  • 0.00002266
  • 0.000007957
  • 0
  • 1.1E-7
  • 1.808E-7
  • 4.928E-7
  • 7.218E-9
  • -0.000008024
Potential Soil quality index (SQP) 2
  • 2.556E+4
  • 1091
  • 0
  • 0.6941
  • 26.06
  • 4.367
  • 4.644
  • -8001
Potential Comparative Toxic Unit for humans - non-cancer effects (HTP-nc) 2
  • 0.000003464
  • 0.000003436
  • 0
  • 2.713E-9
  • 3.014E-8
  • 5.199E-7
  • 4.445E-9
  • -0.000002212
Potential Comparative Toxic Unit for humans - cancer effects (HTP-c) 2
  • 1.853E-7
  • 1.808E-7
  • 0
  • 0
  • 0
  • 1.055E-8
  • 1.21E-10
  • -6.674E-8
Potential Comparative Toxic Unit for ecosystems (ETP-fw) 2
  • 4409
  • 3678
  • 0
  • 2.989
  • 22.76
  • 58.63
  • 2.464
  • -4839